Any organization should have the tools which is help
to achieve the aims and reach to the desired status.
In ORTEC we have a cumulative technical experience
and very good knowledge of the Sudanese market and
its conditions and needs.
On the other hand, ORTEC has a highly qualified and
professional team who is always up to dated with the
newest techniques.
The other important thing is the long list of the
professional partners in many different technical
fields which add more power to ORTEC so that it can
be compared with the global organizations.
| |
1.
Khartoum Co. for Agriculture &
Animal Production (Rawaby Milk)
FACTORY FOR 17000 LPH FRESH MILK
YOGHURT, DRINKING YOGHURT,
BUTTER, CHEESE, AND CREAM.
SCOPE : MECAINACL- ELECTRICAL -
INSTRUMENTAION
Machinery and equipment
Installation milk collection ,
Milk Reception Cream plant
And Yoghurt processing
Product Filling
Cip cleaning plant
Process Heating Complete Steam
Boiler plant
Refrigeration plant, Water
generator and Compressed air
Electrical instrumentation
Electrical installation Main
Switch board inclusive of
breakers
Power Installation inclusive
of cables cable trays an
installation materials
Installation for instrument in
the field on the equipment
Connection the instrument to
local panel and junction boxes
Connection from local panel to
P.L.C board
Electrical connection for
motors pumps To QM Board
Start commissioning for all
equipment and wiring electrical
and control
|
|
| |
1.
Khartoum Co. for Agriculture &
Animal Production (Rawaby Milk)
FACTORY FOR 17000 LPH FRESH MILK
YOGHURT, DRINKING YOGHURT,
BUTTER, CHEESE, AND CREAM.
SCOPE : MECAINACL- ELECTRICAL -
INSTRUMENTAION
Machinery and equipment
Installation milk collection ,
Milk Reception Cream plant
And Yoghurt processing
Product Filling
Cip cleaning plant
Process Heating Complete Steam
Boiler plant
Refrigeration plant, Water
generator and Compressed air
Electrical instrumentation
Electrical installation Main
Switch board inclusive of
breakers
Power Installation inclusive
of cables cable trays an
installation materials
Installation for instrument in
the field on the equipment
Connection the instrument to
local panel and junction boxes
Connection from local panel to
P.L.C board
Electrical connection for
motors pumps To QM Board
Start commissioning for all
equipment and wiring electrical
and control
2.
Omdurman soap & chemicals co
Sudan -2003
installation for instrument in
the field on the equipment
connection the instrument to
local panel and junction boxes
connection from local panel to
plc board
electrical connection for
motors pumps and screw motors
for conveyor to qm board
start commissioning for all
equipment and wiring electrical
and control
cold check for all equipment
(motors- pumps screw weighting
system
hot check for all equipment
(rotational pumps-loading
motors)
calibration for weighting
system
loading program on computer (logoveiw
) system and program for plc
siemens s7
test for program and make some
modification
training for technical team on
system operation and maintenance
Final start up complete check.
3. AL ZAWAYA Group for
Development & Investment
electrical and instrumentation
connection for low voltage,
cable and cable trays
installation setting machinery
(electrical connection and
programming for PLC)
Dryer machine (electrical
connection and programming for
PLC).
4.
Mass Global Cement Plant (Alshamal)
in Atbara City.
Capacity: 3000 ton
Executing electrical and
automation erections.
5. Altakamul Cement Plant in
Atbara City
(partnership between ARESCO &
national
insurances and pensions fund.
Capacity: 5000ton
Executing electrical and
automation erections.
6. Nile Cement Co. in Rabak
City.
Capacity: 1000 ton
Executing electrical erections
commissioning and start up